Toowoomba Second Range Crossing – West Zone 1

Client:

The Main
Roads

Principle
Contractor:

BH Mining

Length
of Project:

7 months

The 41km-long bypass route will run from the Warrego Highway at Helidon Spa in the east to the Gore Highway at Athol in the west, via Charlton. The Second Range Crossing will play a key role in accelerating the growth of regional Australia. Toowoomba is a key, strategic link in the National Land Transport Network with almost half of all exports from the Port of Brisbane originating from regions accessed via the existing Warrego Highway Toowoomba Range section. This route requires almost 22,000 vehicles (including 2900 heavy vehicles) to pass through the city’s Central Business District each day.

Direct Landscape Services are proud to be apart of such a key infrastructure project of this decade. At time of consturction, this project was one of the top 5 largest infrascturure projects be undertaken at that time.

The team commited themselves to providing on ground support and resources to this project for 7 months.