CLIENT:
Frasers
PRINCIPLE CONTRACTOR:
De Luca
LENGTH OF PROJECT:
1 month
LENGTH OF MAINTENANCE:
12 months
Currently being submitted for a 5 Star Green-Star As Built rating, the state-of-the-art Beaulieu Warehouse contributes in a positive way to the reduction of energy and water use in Australia and within commercial business.
Direct Landscape Services was contracted by De Luca to provide a softscape landscape plan which saw the application of topsoil, irrigation, concrete edging, planting and turf to the surrounds of the Beaulieu Warehouse. The wifi capable drip line irrigation system was fitted to draw from a 45,000L rain water tank which was installed to reduce potable water.